Microsoft Office Project 2007 MCTS 70-632 Series: Resourcing Project Plans
Product Code: l_6m04 Time: 1.0 hour(s) CEUs:

Summary:

This course covers forecasting, working with resource pools and assignments, predicting duration and work calculations, and optimizing resource utilization.

Objectives:

  • Forecast time-phased generic skill or role requirements
  • Create, modify, and use resource pools
  • Add, change, substitute, or remove resource assignments
  • Predict durations and work calculations
  • Optimize resource utilization


Topics:


    Technical Requirements:

    P500+ Processor, 128MB of RAM; Windows 2000, 2003, XP, Minimum screen resolution 800x600, Internet Explorer 5.5 or higher; Windows Media Player 9.0 or higher; Flash 8.0 or higher; 56K minimum connection; broadband (256 kpbs or higher) connection recommended; Cookies enabled; Sound card with speakers or headphones strongly recommended.



    Copyright © 2009 MindLeaders. All rights reserved.