Project 2007 Series: Setting Up Resources and Establishing Costs
Product Code: 07pr03 Time: 2.0 hour(s) CEUs:

Summary:

This course explains how to use Project 2007 to assign people and materials as resources to project tasks, manage the work hours of those resources, and configure and monitor project costs.

Objectives:

  • Add information to resources using the Resource Information dialog box
  • Set project start and end dates for a resource
  • Set work hours for a resource
  • Block off vacation time for a resource
  • Assign resources to a task
  • Replace resource assignments
  • Assign a fixed-cost resource to a task
  • View a project's estimated cost
  • Set up resource rate changes
  • Provide for multiple resource rates


Topics:

  • Creating a List of Resources
  • Establishing Resource Availability
  • Assigning and Removing Resources
  • Estimating Project Costs
  • Handling Resource Rate Changes

Technical Requirements:

Minimum 500MHz Processor; 128 MB RAM; Minimum display resolution 1024x768; Windows 2000, XP, Vista, 7 or Mac OS X v10.4+; Internet Explorer 7.0+ or Firefox 3.0+ or Chrome 3.0+ or Safari 4.0+. 56K minimum connection; Adobe Flash Player 9.0+ or Windows Media Player 9.0+ for IE users who do not have Adobe Flash Player; JavaScript, popup windows and cookies enabled; Sound card with speakers or headphones strongly recommended.



Copyright © 2011 MindLeaders. All rights reserved.